Friday, 14 March 2014

Talks with the Editor

I met with Jess, whom I haven't had much of a chance to speak to during the pre production and production phases as she is editing another project.
I talked to her about what kind of footage we had captured and any problems that may arise as well as the tone and feel I wanted for the edit. I then whet through specific dates that wanted to see drafts of the film.

Hand Over Footage: Thursday 20th March (As I would be logging the footage)
Assembly: Tuesday 25th March
Assembly/Rough: Friday 28th March
Rough: Tuesday 1st April
Rough/Final: Thursday 3th April
Final: Sunday 6th April
Sound Handover: Monday 7th April

No comments:

Post a Comment